The Resource Sediment chemistry profiles of capped dredged sediment deposits taken 3 to 11 years after capping/, Alex Sumeri...et. al
Label
Sediment chemistry profiles of capped dredged sediment deposits taken 3 to 11 years after capping/
Title
Sediment chemistry profiles of capped dredged sediment deposits taken 3 to 11 years after capping/
Statement of responsibility
Alex Sumeri...et. al
Contributor
Language
eng
Member of
Index
no index present
Literary form
non fiction
Series statement
  • Dredging Research Technical Note
  • DRP
Series volume
  • DRP-5-09
  • 5-09
Label
Sediment chemistry profiles of capped dredged sediment deposits taken 3 to 11 years after capping/, Alex Sumeri...et. al
Link
http://hdl.handle.net/11681/4898
Publication
Note
Title from title frame
System control number
(Sirsi) a150213
System details
Mode of access: Internet web site

Library Locations

    • ERDC - Vicksburg (US Army Engineer Research and Development Center) Borrow it
      3909 Halls Ferry Road, Vicksburg, MS, 39180-6199, US
      32.3019214 -90.8733482
Processing Feedback ...